Tennessee Valley Authority - Power - Deals and Alliances Profile

 Published On: Dec, 2016 |    No of Pages: 207 |  Published By: GlobalData | Format: PDF
Request Free Sample

Summary

Tennessee Valley Authority (TVA) is a corporate agency providing electricity for business customers, local power companies and distributors. The agency generates power using diverse sources of energy such as hydro, nuclear and other renewable based power plants. TVA provides flood control, navigation and land management for the Tennessee River System. It manages the river system to provide recreational opportunities, improved water quality, adequate water supply, natural resource protection, and economic development for local power companies and state and local governments. The agency, as a wholesale power supplier, sells power to distributor customers such as municipalities and cooperatives. TVA is headquartered in Knoxville, Tennessee, the US.

Tennessee Valley Authority - Power - Deals and Alliances Profile provides you comprehensive data and trend analysis of the company's Mergers and Acquisitions (M&As), partnerships and financings. The report provides detailed information on Mergers and Acquisitions, Equity/Debt Offerings, Private Equity, Venture Financing and Partnership transactions recorded by the company over a five year period. The report offers detailed comparative data on the number of deals and their value categorized into deal types, sub-sector and regions.

GlobalData derived the data presented in this report from proprietary in-house Power eTrack deals database, and primary and secondary research.

Scope

- Financial Deals - Analysis of the company's financial deals including Mergers and Acquisitions, Equity/Debt Offerings, Private Equity, Venture Financing and Partnerships.
- Deals by Year - Chart and table displaying information encompassing the number of deals and value reported by the company by year, for a five year period.
- Deals by Type - Chart and table depicting information including the number of deals and value reported by the company by type such as Mergers and Acquisitions, Equity/Debt Offering etc.
- Deals by Region - Chart and table presenting information on the number of deals and value reported by the company by region, which includes North America, Europe, Asia Pacific, the Middle East and Africa and South and Central America.
- Deals by Sub-sector - Chart and table showing information on the number of deals and value reported by the company, by sub-sector.
- Major Deals - Information on the company's major financial deals. Each such deal has a brief summary, deal type, deal rationale; and deal financials and target Company's (major public companies) key financial metrics and ratios.
- Business Description - A brief description of the company's operations.
- Key Employees - A list of the key executives of the company.
- Important Locations and Subsidiaries - A list and contact details of key centers of operation and subsidiaries of the company.
- Key Competitors - A list of the key competitors of the company.
- Key Recent Developments - A brief on recent news about the company.

Reasons to Buy

Get detailed information on the company's financial deals that enable you to understand the company's expansion/divestiture and fund requirements
- The profile enables you to analyze the company's financial deals by region, by year, by business segments and by type, for a five year period.

Understand the company's business segments' expansion / divestiture strategy
- The profile presents deals from the company's core business segments' perspective to help you understand its corporate strategy.

Access elaborate information on the company's recent financial deals that enable you to understand the key deals which have shaped the company
- Detailed information on major recent deals includes a summary of each deal, deal type, deal rationale, deal financials and Target Company's key financial metrics and ratios.

Equip yourself with detailed information about the company's operations to identify potential customers and suppliers.
- The profile analyzes the company's business structure, locations and subsidiaries, key executives and key competitors.

Stay up-to-date on the major developments affecting the company
- Recent developments concerning the company presented in the profile help you track important events.

Gain key insights into the company for academic or business research
- Key elements such as break up of deals into categories and information on detailed major deals are incorporated into the profile to assist your academic or business research needs.

Note*: Some sections may be missing if data is unavailable for the company.

Table of Contents
Table of Contents 2
List of Tables 7
List of Figures 8
Tennessee Valley Authority, Power, Deals By Year, 2010 to YTD 2016 9
Tennessee Valley Authority, Power Deals By Type, 2010 to YTD 2016 10
Tennessee Valley Authority, Power, Deals By Region, 2010 to YTD 2016 11
Tennessee Valley Authority, Power, Deals By Sector, 2010 to YTD 2016 12
Tennessee Valley Authority, Power, Deals Summary, 2010 to YTD 2016 13
Tennessee Valley Authority, Power, Deal Details 14
Asset Purchase 14
Tennessee Valley Authority Completes Acquisition of Quantum Choctaw Gas Fired Power Plant in Mississippi, US from Quantum Utility Generation 14
Tennessee Valley Invests US$790 Million In John Sevier Power Plant In Northeast Tennessee, US 14
Tennessee Valley Acquires Magnolia Gas Power Plant From Kelson For US$436 Million In US 15
TVA To Invest US$6 Million For Solar PV Project In Kentucky, US 16
TVA To Invest US$4,700 Million For Bellefonte Nuclear Power Plant In Alabama, U.S. 16
TVA To Invest US$248 Million For Bellefonte Nuclear Plant Unit I 17
Tennessee Valley Authority Completes Lease Financing Of US$400 Million For The Acquisition Of Southaven Gas Fired Combined Cycle Plant In Mississippi, US From Seven States Southaven 17
Debt Offering 18
Tennessee Valley Authority Completes Public Offering Of 1.75% Bonds Due 2018 For US$1 Billion 18
Tennessee Valley Completes Public Offering Of 1.875% Notes Due 2022 For US$1 Billion 19
Tennessee Valley Completes Public Offering Of 4.625% Series A Global Power Bonds 2010 Due 2060 For US$1,000 Million 20
Asset Transactions 21
Nuclear Development to Acquire Bellefonte Nuclear Power Plant in Alabama, US from Tennessee Valley Authority for USD111 Million 21
Tennessee Valley Authority - Key Competitors 22
Key Employees 23
Locations And Subsidiaries 25
Head Office 25
Other Locations & Subsidiaries 25
Recent Developments 26
Dec 09, 2016: TVA seeks public opinion on Cumberland power plant’s coal residual storage 26
Dec 05, 2016: TVA Seeks Public Input on Projects at Cumberland Fossil Plant 27
Dec 01, 2016: TVA Proposes New Storage for Coal Combustion Residuals at Bull Run 28
Dec 01, 2016: TVA Seeking Public Input on Draft Environmental Assessment For New Transmission Line 29
Nov 29, 2016: NRC Proposes $140,000 Fine for Violation at Browns Ferry Nuclear Plant 30
Nov 28, 2016: Sequoyah Unit 1 Begins Scheduled Refueling, Maintenance Outage 31
Nov 18, 2016: TVA, NextEra Energy Resources Celebrate Commissioning of Alabama’s Largest Solar Energy Project 32
Nov 17, 2016: TVA Economic Development Efforts Drive Record Investment During FY 2016 33
Nov 15, 2016: TVA Reports Record Net Income for Fiscal Year 2016 34
Nov 14, 2016: TVA Completes Bellefonte Sale 35
Nov 14, 2016: Nuclear Development, LLC Enters into Contract to Purchase Bellefonte Nuclear Power Plant 36
Nov 10, 2016: TVA Delivers on Its Mission of Serving the People of the Tennessee Valley 37
Nov 04, 2016: Browns Ferry Unit 1 Successfully Completes Outage 38
Nov 02, 2016: TVA’s Unit 2 at Watts Bar nuclear plant returns to service 39
Nov 01, 2016: Utilities Partner to Enhance Power Grid Preparedness 40
Nov 01, 2016: TVA Crews Install New High Voltage Transmission Lines in Oxford 41
Oct 26, 2016: NRC Schedules Meeting with TVA to Discuss Work Environment at Watts Bar 42
Oct 24, 2016: Southern Company, TVA Sign Mutual Aid Agreement to Help Restore Power After Significant Events 43
Oct 19, 2016: TVA’s Watts Bar Unit 2 Achieves Commercial Operation 44
Oct 07, 2016: Combustion Testing Begins at Paradise CC Plant 45
Oct 03, 2016: Watts Bar Unit 2 Completes Power Ascension Testing Requirements 46
Oct 03, 2016: TVA’s Browns Ferry 1 nuclear power unit shuts down for refueling outage 47
Sep 30, 2016: TVA's Unit 2 at Watts Bar nuclear power plant attains 100% power capacity 48
Sep 29, 2016: TVA Seeks Public Comment on Options for New Knoxville Headquarters 49
Sep 26, 2016: Watts Bar Nuclear Unit 2 Resumes Testing 50
Sep 22, 2016: TVA President and CEO Bill Johnson Promotes Leaders 51
Sep 15, 2016: TVA Environmental Assessment Supports Dewatering Facility at Shawnee 52
Sep 12, 2016: Sequoyah Exercise Tests Coordination of TVA, Federal, State and Local Agencies 53
Aug 25, 2016: TVA Reduces Budget Requirements and Continues Investment in Cleaner Power 54
Aug 16, 2016: Huntsville Utilities CEO Stowe To Lead TVA’s New Green Energy Group 56
Aug 03, 2016: TVA finishes second controlled shutdown of Watts Bar Unit 2 57
Aug 02, 2016: TVA Reports Third Quarter FY 2016 Financial Results 58
Jul 29, 2016: TVA Decides Coal Combustion Residuals More Safely Stored In Place 59
Jul 27, 2016: TVA Seeks Comments on Solar Project 60
Jul 26, 2016: General Atomics Radiation Monitoring Systems Operating at New U.S. Nuclear Power Plant 61
Jul 25, 2016: TVA Helps Airports, FedEx Achieve Cleaner Air 62
Jul 19, 2016: TVA Seeking Public Input on Future of Colbert Fossil Plant 63
Jul 18, 2016: Concentric Energy Advisors, Inc. Announces Process for Bellefonte Nuclear Plant Sale 64
Jul 18, 2016: Testing Nation’s Newest Nuclear Generation to Ensure Safety, Quality and Reliability 65
Jul 05, 2016: TVA Identifies Preferred Route for Future Transmission Line 66
Jun 28, 2016: Westinghouse Fleet Expands With Tva’s Watts Bar Unit 2 67
Jun 21, 2016: Elevated tritium found at TVA’s Browns Ferry nuclear plant well 68
Jun 15, 2016: TVA Seeks Public Comment on Shawnee Coal Ash Dry Storage Facility 69
Jun 13, 2016: TVA Proposes Closure-in-Place for Coal Combustion Residuals 70
Jun 06, 2016: TVA’s Watts Bar 2 nuclear unit shuts down automatically 71
Jun 03, 2016: Watts Bar Unit 2 Produces Electricity for the First Time 72
May 26, 2016: NRC Announces Public Availability of Clinch River Early Site Permit Application 73
May 25, 2016: TVA recognizes MTEMC EnergyRight Solutions efforts 74
May 23, 2016: Watts Bar Unit 2 Operates Under Own Power for First Time 75
May 18, 2016: Paul Simmons Named Watts Bar Site Vice President 76
May 18, 2016: TVA Seeking Comments on Proposed Ash Storage at Bull Run Fossil Plant 77
May 13, 2016: TVA Submits Early Site Permit Application For Clinch River SMRs 78
May 12, 2016: TVA Seeks Public Comments on Two Solar Projects 79
May 09, 2016: TVA Identifies Preferred Route for Power Line Near Guthrie 80
May 04, 2016: Jacobs Wins Construction Management Contract for Tennessee Valley Authority 81
May 03, 2016: TVA Reports Second Quarter Financial Results 82
May 02, 2016: TVA Invites the Public to Ackerman Gas Plant Dedication 83
May 02, 2016: Brewer Named TVA’s Chief Communications and Marketing Officer 84
Apr 27, 2016: NRC Schedules Open House to Discuss 2015 Performance at Watts Bar Nuclear Plant 85
Apr 25, 2016: ABB FACTS solution to help maintain grid stability as power generation mix changes 86
Apr 21, 2016: Public Input on Potential Bellefonte Sale Available Online: Tennessee Valley Authority 87
Apr 18, 2016: TVA and Silicon Ranch Partner on Large-Scale Solar Farm at NSA Mid-South 88
Apr 14, 2016: NRC Schedules Open House and Meeting to Discuss Assessment of Sequoyah Nuclear Plant and NRC Research Analyzing Unlikely Accidents 89
Apr 13, 2016: NRC Schedules Open House to Discuss Agency’s 2015 Assessment of Browns Ferry Nuclear Plant 90
Apr 06, 2016: TVA Environmental Review Supports Dewatering Facility at Kingston 91
Mar 29, 2016: TVA Awards 16.7 Megawatts of Solar Capacity through Distributed Solar Solutions 92
Mar 29, 2016: NRC Meetings April 12 in Oak Ridge, Tenn., to Discuss Review Process for Early Site Permit Application 93
Mar 28, 2016: Browns Ferry Unit 3 Completes Refueling and Maintenance Outage 94
Mar 24, 2016: Colbert Fossil Plant Ends 61 Years of Electrical Generation: Tennessee Valley Authority 95
Mar 17, 2016: NRC Schedules Meeting with TVA to Discuss Watts Bar Nuclear Plant Work Environment 96
Mar 16, 2016: Westinghouse Captures TVA Fleet Contract 97
Mar 01, 2016: Savings on TVA Fuel Costs Shared with Consumers 98
Feb 25, 2016: Environmental Review Supports Transmission Project in Van Buren County, Tennessee 99
Feb 22, 2016: Browns Ferry Unit 3 Begins Scheduled Refueling & Maintenance Outage 100
Feb 19, 2016: Geotechnical Core Drilling Begins at Chickamauga Dam: TVA 101
Feb 18, 2016: Westinghouse to provide outage services for Tennessee Valley Authority's nuclear plants 102
Feb 13, 2016: TVA abandons construction of two reactors at Bellefonte nuclear power plant in Alabama 103
Feb 11, 2016: Ritch To Continue As Board Chair: Tennessee Valley Authority 104
Feb 09, 2016: Gallatin Dry Scrubbers Fully Operational: TVA 105
Feb 05, 2016: TVA Extends Public Comment Period on Closure of Coal Impoundments 106
Feb 03, 2016: Mild Weather Impacts TVA’s First Quarter Earnings 107
Feb 03, 2016: TVA’s cost for Watts Bar 2 nuclear power unit increases to $4.7bn 108
Feb 02, 2016: TVA completes first phase of repairs at Boone Dam 109
Jan 16, 2016: TVA requests comments on proposed solar power purchase agreement in Tennessee 110
Jan 09, 2016: Tennessee Valley Authority to begin work on natural gas-fired power plant in Memphis 111
Dec 22, 2015: Governor Haslam, Commissioner Boyd Announce Google to Locate New Data Center in Clarksville 112
Dec 16, 2015: Richard Howorth Sworn In For Second Term on TVA Board 113
Dec 15, 2015: TVA Loads Fuel into New Watts Bar Unit 2 Reactor 114
Dec 15, 2015: Sequoyah Unit 2 Completes Refueling and Maintenance Outage 115
Dec 05, 2015: TVA begins fuel loading at Watts Bar 2 nuclear power unit 116
Dec 04, 2015: TVA Seeks Comment on Proposed Transmission Project in Haywood and Fayette Counties, Tennessee 117
Dec 03, 2015: GE Hitachi Awarded Outage Services Contract by TVA 118
Nov 20, 2015: Lower Operating Costs Drive Strong TVA 2015 Financial Results 119
Nov 20, 2015: TVA Economic Development Efforts Spur $7.8 Billion in Investments in FY 2015 120
Nov 16, 2015: Sequoyah Unit 2 Begins Scheduled Refueling, Maintenance Outage 121
Nov 12, 2015: NRC to Increase Oversight of Sequoyah Nuclear Plant 122
Nov 09, 2015: TVA Announces New Sequoyah Site Vice President 123
Nov 02, 2015: Browns Ferry Emergency Exercise to Involve TVA, Federal, State and Local Agencies 124
Nov 02, 2015: Watts Bar Nuclear Plant Emergency Exercise to Involve Federal, State, Local Agencies 125
Oct 28, 2015: Draft Environmental Assessment for Boone Project Available for Public Comment: Tennessee Valley Authority 126
Oct 22, 2015: NRC Issues Operating License for Watts Bar Unit 2, Oversight Continues 127
Oct 05, 2015: Raccoon Mountain Temporarily Closing for Routine Reservoir Maintenance 128
Sep 28, 2015: NRC Renews Operating Licenses for TVA’s Sequoyah Nuclear Plant 129
Sep 24, 2015: TVA completes safety test of Watts Bar 2 nuclear power unit 130
Sep 21, 2015: TVA begins refueling and maintenance outage at Watts Bar 1 nuclear unit 131
Sep 21, 2015: Watts Bar Unit 1 Begins Scheduled Refueling, Maintenance Outage 132
Sep 18, 2015: EPB and TVA to Launch Solar Share 133
Aug 27, 2015: TVA Seeks Input on Study for Closing Coal Ash Storage Sites 134
Aug 25, 2015: Global Power Equipment Group Provides Update on Services Segment 135
Aug 21, 2015: TVA Board Votes to Continue Power System Investments 136
Aug 18, 2015: Watts Bar 2 Ready for Operating License, TVA Says 137
Aug 14, 2015: Watts Bar Unit 2 is Substantially Complete, TVA Requests Issuance of License 138
Aug 13, 2015: TVA considers proposal to buy output of 80-MW solar project in Alabama 139
Aug 13, 2015: Eric Satz Sworn In as TVA Board Member 140
Aug 12, 2015: TVA Seeks Public Comments on Proposed Solar Power Purchase Agreement 141
Aug 11, 2015: TVA Completes Comprehensive Testing of Watts Bar Unit 2 Systems 142
Aug 04, 2015: TVA Reports Continued Higher Income on Lower Operating Costs 143
Jul 28, 2015: Duck River Selects DVI for Full Deployment of EDGE Volt/VAR Optimization Platform 144
Jul 24, 2015: TVA’s Sequoyah 1 nuclear unit stops automatically 145
Jul 23, 2015: TVA Asks for Comments on Proposed Transmission Project 146
Jul 13, 2015: TVA’s Integrated Resource Plan Calls for Low-Cost, Reliable Energy Choices 147
Jul 09, 2015: Eastern Interconnection Grid Planning Collaborative Completes Study of Gas-Electric Interface 148
Jul 06, 2015: TVA Identifies Preferred Route for Transmission Line 149
Jul 02, 2015: TVA Identifies Preferred Route for Rickman Transmission Line 150
Jun 30, 2015: Huntsville Utilities Monitors and Saves Energy with New Sensus Conservation Voltage Reduction Solution 151
Jun 29, 2015: Power Outage For McEwen 152
Jun 24, 2015: Google Chooses TVA Site for Next Data Center 153
Jun 08, 2015: Advisory Panel Reviews Integrated Resource Plan Comments, Recommendations 154
Jun 01, 2015: Google plans to invest $600M in new data center on TVA site 155
May 28, 2015: TVA Asks for Comments on Proposed Miss. Transmission Project 156
May 27, 2015: NRC Commissioners Delegate Authority to Issue Watts Bar Unit 2 Operating License 157
May 20, 2015: TVA nuclear unit returns to operation after enhancing safety 158
May 18, 2015: Sequoyah Unit 1 Safely Completes Scheduled Refueling, Maintenance Outage 159
May 18, 2015: TVA Presents Plans for Proposed Transmission Project 160
May 13, 2015: TVA Identifies Preferred Route for Ala. Transmission Line 161
May 08, 2015: TVA’s McCormick to Head National Hydropower Association 162
May 07, 2015: NRC Schedules Public Meeting May 14 to Discuss Agency’s 2014 Assessment of Browns Ferry Nuclear Plant 163
May 07, 2015: TVA Board Updated on Operations at its Quarterly Meeting 164
May 01, 2015: TVA Reports Higher Net Income on Lower Operating Costs for the First Half of Fiscal Year 2015 165
Apr 30, 2015: TVA’s Watts Bar nuclear plant prepares reactor for operation 166
Apr 29, 2015: NRC, Tennessee Valley Authority Meeting May 5 in Rockville, MD to Discuss Emergency Planning for Proposed Clinch River Site 167
Apr 20, 2015: TVA Releases Draft Environmental Assessment For Johnsonville Steam Supply 168
Apr 20, 2015: TVA To Hold Public Meeting in Bowling Green on Draft Integrated Resource Plan 169
Apr 15, 2015: Browns Ferry Unit 2 Online After Scheduled Refueling 170
Apr 14, 2015: TVA Conducts Field Studies at Chickamauga 171
Apr 13, 2015: Sequoyah Unit 1 Begins Scheduled Refueling, Maintenance Outage 172
Apr 06, 2015: TVA To Hold Public Meeting on Draft Integrated Resource Plan 173
Apr 03, 2015: Environmental Review Supports Removing John Sevier Structures 174
Apr 02, 2015: TVA Seeks Comment on Dewatering Facility at Kingston 175
Mar 31, 2015: TVA Identifies Preferred Route for Transmission Line 176
Mar 25, 2015: Toshiba Receives Order to Supply Steam Turbine and Generator for Allen Combined Cycle Power Plant in the USA 177
Mar 20, 2015: NRC Schedules Open House and Meeting to Discuss Watts Bar Unit 2 Construction 178
Mar 16, 2015: Browns Ferry Unit 2 Begins Scheduled Refueling, Maintenance Outage 179
Mar 16, 2015: TVA Begins Public Meetings on Draft Integrated Resource Plan 180
Mar 11, 2015: NRC Proposes $70,000 Fine for Violations at Sequoyah Nuclear Plant 181
Mar 10, 2015: TVA resumes electricity generation at Sequoyah 2 nuclear unit 182
Mar 09, 2015: NRC Schedules Open House to Discuss Annual Assessment of Watts Bar Nuclear Plant Unit 1 183
Mar 09, 2015: TVA Releases Draft Integrated Resources Plan for Public Review 184
Mar 03, 2015: TVA’s Sequoyah Nuclear Plant Unit 2 Offline 185
Feb 23, 2015: TVA Identifies Preferred Route for Transmission Line 186
Feb 22, 2015: Statement on Watts Bar Unit 1 Reactor Trip 187
Feb 13, 2015: Watts Bar Unit 2 Passes Key Milestone on Path to Operating License 188
Feb 12, 2015: TVA Board Discusses Improved Performance, Generation Additions 189
Feb 12, 2015: Jeffery Phillips Named TVA Engineer of the Year 191
Feb 04, 2015: TVA expects to complete Watts Bar 2 nuclear power unit by 2015 192
Feb 04, 2015: TVA Reports $81M Net Income for First Quarter 2015 193
Feb 02, 2015: TVA Response to Administration’s FY 2016 Budget 194
Jan 27, 2015: TVA To Discuss First Quarter 2015 Financial Results 195
Jan 26, 2015: TVA Identifies Preferred Route for Miss. Transmission Line 196
Jan 19, 2015: NYSERDA and TVA Officials Join 2015 Advisory Board for DNV GL's Utility of the Future Leadership Forum 197
Jan 15, 2015: GE to Replace TVA’s Coal Units with Cleaner, High-Efficiency H-Class Gas Turbines 198
Jan 15, 2015: TVA Identifies Preferred Locations for Proposed Transmission Project 199
Jan 15, 2015: TVA on Track for 2015 Startup of Watts Bar 2 200
Jan 12, 2015: TVA, Local Power Companies Unveil New ‘eScore’ Home Energy Program 201
Jan 11, 2015: TVA reports radioactive water leak at Browns Ferry NPP 202
Jan 08, 2015: TVA, DuPont to Continue Cogeneration Partnership at Johnsonville 203
Jan 08, 2015: Sherry Quirk Named TVA Executive Vice President and General Counsel 204
Jan 07, 2015: Appeal to Reduce Energy Usage 205
Jan 05, 2015: NRC Meeting Jan. 14 to Discuss Status of Watts Bar Unit 2 Licensing, Construction Schedule 206
Appendix 207
Methodology 207
About GlobalData 207
Contact Us 207
Disclaimer 207

List of Tables
Tennessee Valley Authority, Power, Key Facts, 2015 1
Tennessee Valley Authority, Power, Deals Summary, 2010 to YTD 2016 1
Tennessee Valley Authority, Power, Deals By Year, 2010 to YTD 2016 9
Tennessee Valley Authority, Power Deals By Type, 2010 to YTD 2016 10
Tennessee Valley Authority, Power, Deals By Region, 2010 to YTD 2016 11
Tennessee Valley Authority, Deals By Sector, 2010 to YTD 2016 12
Tennessee Valley Authority, Power, Deals Summary, 2010 to YTD 2016 13
Tennessee Valley Authority Completes Acquisition of Quantum Choctaw Gas Fired Power Plant in Mississippi, US from Quantum Utility Generation 14
Tennessee Valley Invests US$790 Million In John Sevier Power Plant In Northeast Tennessee, US 14
Tennessee Valley Acquires Magnolia Gas Power Plant From Kelson For US$436 Million In US 15
TVA To Invest US$6 Million For Solar PV Project In Kentucky, US 16
TVA To Invest US$4,700 Million For Bellefonte Nuclear Power Plant In Alabama, U.S. 16
TVA To Invest US$248 Million For Bellefonte Nuclear Plant Unit I 17
Tennessee Valley Authority Completes Lease Financing Of US$400 Million For The Acquisition Of Southaven Gas Fired Combined Cycle Plant In Mississippi, US From Seven States Southaven 17
Tennessee Valley Authority Completes Public Offering Of 1.75% Bonds Due 2018 For US$1 Billion 18
Tennessee Valley Completes Public Offering Of 1.875% Notes Due 2022 For US$1 Billion 19
Tennessee Valley Completes Public Offering Of 4.625% Series A Global Power Bonds 2010 Due 2060 For US$1,000 Million 20
Nuclear Development to Acquire Bellefonte Nuclear Power Plant in Alabama, US from Tennessee Valley Authority for USD111 Million 21
Tennessee Valley Authority, Key Competitors 22
Tennessee Valley Authority, Key Employees 23
Tennessee Valley Authority, Other Locations 25

List of Figures
Tennessee Valley Authority, Power, Deals by Type, 2010 to YTD 2016 1
Tennessee Valley Authority, Power, Deals By Year, 2010 to YTD 2016 1
Tennessee Valley Authority, Power, Deals By Region, 2010 to YTD 2016 1
Tennessee Valley Authority, Power, Deals By Sector, 2010 to YTD 2016 1
Tennessee Valley Authority, Power, Deals By Year, 2010 to YTD 2016 9
Tennessee Valley Authority, Power, Deals by Type, 2010 to YTD 2016 10
Tennessee Valley Authority, Power, Deals By Region, 2010 to YTD 2016 11
Tennessee Valley Authority, Power, Deals by Sector, 2010 to YTD 2016 12


If the above report does not have the information suitable for your business, we can provide custom research that can be lucrative for your business or enhance your profession.